Construction BOQ, Cost Estimate and Project Schedule (Excel)
Bill of quantities, material costing and a phase schedule from your own drawings
Service details
Bill of quantities, material costing and a phase schedule from your own drawings
What you get:
- Basic: BOQ template filled from your quantities; Rate-analysis sheet
- Standard: everything in Basic plus Material and labour cost summary; Phase schedule with milestones
- Premium: everything in Standard plus Cash-flow and procurement plan; Variation tracker and progress-billing sheet
Scope limits:
- Basic: up to 30 BOQ items
- Standard: up to 100 BOQ items
- Premium: up to 300 BOQ items
What to provide when ordering:
- Drawings and measured quantities
- Local rate schedule
- Project timeline
Limits and responsibilities:
- Outputs are concept and calculation aids; a licensed engineer must verify them before construction or purchase
- All references, figures and facts must be verified by you before use
- This is not financial or investment advice
- Work beyond these limits or extra revisions is quoted separately
After ordering, submit the required details and files in the My Services section of your account. Delivery files appear there when the work is done, and you can request revisions if needed.
- Delivery on time
- Direct messaging
- Confidentiality assured
| Plans | Basic | Standard | Premium |
|---|---|---|---|
| Price | ৳3,700 | ৳11,100 | ৳27,800 |
| Delivery | 3 days | 6 days | 12 days |
| Revision | 1 | 2 | 3 |
| What you get |
|
|
|
What happens after you order
- PaymentPay online or with bKash/Nagad.
- Share detailsAdd the required information and files on the My Services page. The delivery time starts from then.
- DeliveryYou'll receive the files there when the work is done. Ask for a revision if needed, otherwise accept it.
Ratings & Reviews
No reviews yet.