+8809696405290

Construction BOQ, Cost Estimate and Project Schedule (Excel)

Bill of quantities, material costing and a phase schedule from your own drawings

Business and Consulting

Construction BOQ, Cost Estimate and Project Schedule (Excel)

Service details

Bill of quantities, material costing and a phase schedule from your own drawings

What you get:
- Basic: BOQ template filled from your quantities; Rate-analysis sheet
- Standard: everything in Basic plus Material and labour cost summary; Phase schedule with milestones
- Premium: everything in Standard plus Cash-flow and procurement plan; Variation tracker and progress-billing sheet

Scope limits:
- Basic: up to 30 BOQ items
- Standard: up to 100 BOQ items
- Premium: up to 300 BOQ items

What to provide when ordering:
- Drawings and measured quantities
- Local rate schedule
- Project timeline

Limits and responsibilities:
- Outputs are concept and calculation aids; a licensed engineer must verify them before construction or purchase
- All references, figures and facts must be verified by you before use
- This is not financial or investment advice
- Work beyond these limits or extra revisions is quoted separately

After ordering, submit the required details and files in the My Services section of your account. Delivery files appear there when the work is done, and you can request revisions if needed.

  • Delivery on time
  • Direct messaging
  • Confidentiality assured

What happens after you order

  1. PaymentPay online or with bKash/Nagad.
  2. Share detailsAdd the required information and files on the My Services page. The delivery time starts from then.
  3. DeliveryYou'll receive the files there when the work is done. Ask for a revision if needed, otherwise accept it.

Ratings & Reviews

No reviews yet.